01Safety
An earlier warning, never the only one.
Ionaria adds a second, earlier layer of warning and better evidence. Your BMS, detection and suppression stay in charge.
02Principles
Four rules we build by.
Limits first
Datasheet and site limits bound every recommendation.
Explain everything
Every alert and forecast shows why.
People approve
Safety actions need a named person.
Fail safe
If Ionaria goes quiet, your existing rules carry on.
03Method
How a warning is made.
- 01
Expect
The twin predicts each cell’s temperature and voltage.
- 02
Compare
Sentinox measures the gap to what the cell actually does.
- 03
Rate
Known precursors and the gap become a graded risk.
- 04
Escalate
Watch, act or call out, per your playbook.
04Standards
Standards context.
| Standard | Scope | How Ionaria helps |
|---|---|---|
| UL 9540A | Fire test method for battery storage | Simulated propagation scenarios to plan tests |
| NFPA 855 | Installing stationary storage | Monitoring evidence for site safety plans |
| IEC 62619 | Safety of industrial lithium cells | Cell history and abuse simulations |
| UL 1973 | Batteries for stationary and motive use | Supporting data for design reviews |
| ISO 26262 | Functional safety in road vehicles | Documented model limits for OEM safety cases (planned) |
| UN 38.3 | Transporting lithium batteries | Pack history for second-life shipping |
Ionaria is not a certification body and holds no certifications. It helps you gather evidence for your own compliance work.
05Audit trail
Every step on the record.
- Model version and data behind every forecast
- Who approved which action, and when
- Exportable for incident reviews and insurers
06Security
How we protect data.
Isolation
Tenants separated; sites can be split.
Encryption
In transit and at rest.
Audits
SOC 2 Type I and ISO 27001 planned.
07Questions
Straight answers.
Can Ionaria cause a fire?
It cannot exceed your limits, and it never removes your BMS protection. Its job is to warn earlier.
Who is responsible for a decision?
The person who approves it. Ionaria records the evidence they saw.
08Next step
Send one month of cycle data. Get one pack twin back.
Export a month of BMS telemetry from a few packs. We return a calibrated twin, a state-of-health and remaining-life estimate per pack, and the three cells we would watch first.